BS Standard Prefabricated Steel Bridge

BS Standard Prefabricated Steel Bridge

This is our Bailey-type truss built, fabricated, and certified to British Standards - chiefly BS 5400, with the related National Highways design manuals. The classic Bailey geometry goes back to WWII British military use; we've updated it to modern BS 5400 loadings, materials, and fabrication tolerances. It's rated for UK HA and HB loads, including HB45, HB20, and the HBW (Hazchem Wheel) configurations. The bs standard prefabricated steel bridge is built for this.
Send Inquiry
Description
Technical Parameters

Product Introduction

 

This is our Bailey-type truss built, fabricated, and certified to British Standards - chiefly BS 5400, with the related National Highways design manuals. The classic Bailey geometry goes back to WWII British military use; we've updated it to modern BS 5400 loadings, materials, and fabrication tolerances. It's rated for UK HA and HB loads, including HB45, HB20, and the HBW (Hazchem Wheel) configurations. The bs standard prefabricated steel bridge is built for this.

For UK and Commonwealth road authorities, highway contractors, and Royal Engineer units that specify British Standards, this is the natural choice. We supply BS-compliant calculations, fabrication inspection records, and mill certificates so it clears your approvals.

 

Features

 

Designed to BS 5400 - the UK bridge code accepted by National Highways and every local authority. The bs standard prefabricated steel bridge makes this practical.

HA + HB capability covers normal highway traffic and abnormal heavy loads

The 3.048 m British Bailey panel matches the UK's historical Bailey stockpile

BS EN ISO 1461 galvanizing meets UK highway specification

Welding and fabrication controlled to BS EN ISO 15614 and BS EN ISO 9606

Comes with BS-compliant calcs signed by a UK Chartered Engineer (CEng)

HA + 25 HB rating handles most abnormal load moves on the UK network

Modular build uses standard British Bailey 50 mm panel pins

 

Working Principle

 

The structure follows the classic Bailey truss, but we analyze it to BS 5400 load combinations. You build two parallel trusses from 3.048 m (10 ft) British-standard panels pinned end-to-end. Under HA loading - a uniform lane load plus a knife-edge load - or under HB loading, which models a multi-axle abnormal vehicle, the chords resist bending (top in compression, bottom in tension) and the diagonal webs resist panel shear. BS 5400 applies its load factors (γ_f) and material partial factors (γ_m) to get the factored member forces. The bs standard prefabricated steel bridge is built for this.

The deck spreads wheel loads sideways between the two trusses per the BS 5400 distribution rules, and we check fatigue using the HA loading as the spectrum. Impact factors from BS 5400 Part 2 cover the dynamic vehicle loads, and every connection - pins, bolts, welded gussets - is checked for strength, serviceability, and fatigue under Part 6 (fabrication) and Part 3 (design). The result carries the required HA + HB with a sensible reserve.

UK highway temporary detour bridges (National Highways / local authority). The bs standard prefabricated steel bridge makes this practical.

Permanent rural road bridges in the UK, Ireland, and Commonwealth countries (Australia, New Zealand, India)

Abnormal load crossings needing HB45 capacity

UK military (Royal Engineers) reserve bridging fleet

Pipeline and utility company temporary access bridges on the UK network

Canal, river, and railway under-bridges in the UK needing modular replacement

Hot Tags: bs standard prefabricated steel bridge, China bs standard prefabricated steel bridge manufacturers, suppliers, factory, 321 Bailey Bridge, Compact 200 Bailey Bridge, Compact 200 Bailey Steel Bridge, Compact 200 type Temporary Steel Bridge, Double Lane Bailey Steel Bridge, Single Lane Bailey Steel Bridge

Send Message