S355JR Bailey Bridge

S355JR Bailey Bridge

This is our the s355jr bailey bridge for jobs that ask more of the structure than mild steel can give. S355JR carries a minimum yield of 355 MPa, well above the S235JR or A36 used in a conventional Bailey, so you get the same panel geometry but a bridge that handles heavier loads or longer spans without putting on weight.
Send Inquiry
Description
Technical Parameters

Product Introduction

 

This is our the s355jr bailey bridge for jobs that ask more of the structure than mild steel can give. S355JR carries a minimum yield of 355 MPa, well above the S235JR or A36 used in a conventional Bailey, so you get the same panel geometry but a bridge that handles heavier loads or longer spans without putting on weight.

We keep the classic Bailey panel: 1.524 m long, 1.524 m truss height. Every chord, web, and connection member is cut from S355JR plate and section. When the traffic is heavy military kit, high-volume highway runs, or a long-span setup where standard-grade steel just won't do, this is the one we point customers to.

 

Features

 

S355JR gives roughly 50% higher yield than S235JR mild steel. The s355jr bailey bridge makes this practical.

Same panel geometry as a standard Bailey - fully compatible with existing hardware and accessories

Better strength-to-weight ratio means longer spans per storey

Hot-dip galvanized finish delivers 20+ years in permanent installations

Modular panels go up fast without skilled welders on site

Certified to Eurocode 3 and AASHTO LRFD for international acceptance

Offered in single-lane, double-lane, and pedestrian layouts

Factory QC supplies mill certificates for every batch

 

Working Principle

 

The structure follows the original Bailey modular truss idea - we just upgraded the steel. You bolt or pin individual panels end-to-end to form the two parallel trusses, then the S355JR takes over. Because each chord and web member now has a higher yield, it carries a bigger factored load before it yields. Under gravity, the top chord goes into compression and the bottom chord into tension; the diagonal webs carry the panel shear. With S355JR's higher yield, the same cross-sectional areas in those chords and webs resist proportionally greater moments and shears. The s355jr bailey bridge is built for this.

That's what lets the designer do one of two things: carry heavier traffic - MLC 70+ or HB20 military loads - at the same span, or reach a longer span at the same rating. The connections stay the classic 50 mm panel pins, so every Bailey accessory we make - transom clamps, sway bracing, rakers - still fits. Each span behaves as a simply supported truss, with the floor system moving loads through stringers and transoms into the chords, and on down to the abutments or piers.

 

Applications

 

Heavy military vehicle crossings (MLC 70+) needing high capacity. The s355jr bailey bridge makes this practical.

Highway temporary bridges under HL-93 design truck loading

Long-span river crossings where single-storey mild-steel Bailey falls short

Permanent rural road bridges in developing regions with low maintenance

Mining and quarry access bridges hauling heavy ore trucks

Emergency disaster-response bridges built for heavy rescue equipment

Hot Tags: s355jr bailey bridge, China s355jr bailey bridge manufacturers, suppliers, factory, 321 Bailey Bridge, bailey bridge, Compact 200 Bailey Bridge, Compact 200 Bailey Steel Bridge, Compact 200 type Temporary Steel Bridge, Single Lane Bailey Steel Bridge

Send Message