What It Is
A variable span bailey bridge changes length on demand. The span is not fixed at the factory. Truss panels are added or removed on site. Each panel adds 3 meters of reach. The same component set handles a 9-meter crossing or a span beyond 60 meters. Jiangsu Jiuzhou Bridge Engineering Co., Ltd. configures panels by actual span, not by what is in stock.
How Span Adjusts
Span adjustment works through panel linking. Each panel is 3 meters long. Male and female ends mate. A panel pin locks them. To shorten, remove a middle section. To extend, connect another panel at the end. Single-row single-story is the base form. Its span and load are limited. Going further requires stacking and widening. Double-story increases bending resistance. Double-row widens the section. Panel count, stories, and rows combine to cover a span range from 9 meters to over 76 meters-.
Structural Fit
Variable span depends on standardized holes. Every panel uses the same chord bolt holes, pin holes, and brace holes. On-site changes need no drilling or cutting. Transom clamps adjust to panel spacing. Sway braces use turnbuckles for length fine-tuning. Deck panels lay section by section. All mating parts are trial-fitted at the factory. Bolts are grade 8.8. Pins are 30CrMnTi. Both are interchangeable with fixed-span bailey bridges.
Products Description
The variable span bailey bridge starts at 9 meters. Single-row single-story suits short spans and light loads, such as a construction access over a ditch. Double-row double-story pushes past 45 meters, carrying Auto-20 or Trailer-80. Triple-row double-story is the heavy setup. Maximum free span reaches 76.2 meters-. Load class rises with rows and stories: single-row single-story matches Auto-10, double-row single-story reaches Auto-20, double-row double-story handles Trailer-80. Deck widths are 3.7m, 4.2m, or 7.35m. The final setup is calculated from span and traffic load.
Where It Works
Three situations favor a variable span bailey bridge. First, river width shifts with the season. A short span goes up in dry months and comes down before flood. Second, the work front advances. The bridge extends or retracts as the site moves. Third, a wide gap needs multiple spans. Intermediate piers split the crossing. Each span adjusts independently. No need to upsize every component. Temporary access during old bridge demolition and utility trench crossings also use this stepped configuration.
Selection & Contact
Selection asks two things: maximum span, and traffic load. Jiangsu Jiuzhou Bridge Engineering Co., Ltd. supplies panels, pins, chord reinforcements, sway braces, and transom clamps as a complete set. Panels are configured to your drawing. Send your span and load figures for a selection proposal.