Temporary Bailey Bridge For Quarry Site Access

Temporary Bailey Bridge For Quarry Site Access

Inside a working quarry the traffic never lets up. Haul trucks, loaders and excavators cross the same spot thousands of times a day, loaded, dusty and unforgiving. The temporary bailey bridge for quarry site access is built for exactly that: a heavy-duty modular crossing over a drainage ditch, conveyor cut, watercourse or property boundary within the pit.
Send Inquiry
Description
Technical Parameters

Product Introduction

 

Inside a working quarry the traffic never lets up. Haul trucks, loaders and excavators cross the same spot thousands of times a day, loaded, dusty and unforgiving. The temporary bailey bridge for quarry site access is built for exactly that: a heavy-duty modular crossing over a drainage ditch, conveyor cut, watercourse or property boundary within the pit.

Quarry traffic is repetitive, heavily loaded and dirty, so the bridge has to shrug off fatigue, wide-tyre impact and coarse abrasive dust. We normally leave it in place for the life of the quarry face it serves, then move it as the pit advances. The rating is matched to the biggest haul truck on site, not to a generic highway load.

 

Features

 

Sized for quarry haul truck loads and fatigue. The temporary bailey bridge for quarry site access makes this practical.

Heavy deck and close transom spacing.

reliable enough for dust, mud and impact.

Moveable as the quarry face advances.

Wide deck for two-way truck flow.

Low-cost, rapid installation.

 

Working Principle

 

Think of it as a modular parallel-chord truss that lives or dies by how it handles wheel loads. The thick 10 mm deck plate and the transoms spaced every 1.5 m take the truck tyres first, so each panel node only ever sees a manageable share of the gross vehicle weight. That is what keeps the structure from overloading under a 200-tonne truck. The temporary bailey bridge for quarry site access is built for this.

The harder problem in a quarry is repetition. With thousands of load cycles, the weak points are the pin holes and the welded panel nodes, so we run fatigue checks there specifically. Support is simple: concrete abutments or timber cribs filled with quarry spoil. And because the whole thing is modular, when the pit moves forward we dismantle it and re-erect it at the new location with the same panels. Nothing is thrown away.

 

Applications

 

These crossings mainly serve internal quarry access over drains, conveyor trenches and watercourses, and the routes between the quarry face and the processing plant. They also bridge the voids left by bench excavation and stand in for temporary bridges on mining and aggregate sites that must carry multi-cycle heavy truck traffic. Construction sites where large earthmoving plant must cross a drainage channel use them too. The temporary bailey bridge for quarry site access is built for this.

Hot Tags: temporary bailey bridge for quarry site access, China temporary bailey bridge for quarry site access manufacturers, suppliers, factory, 321 Bailey Bridge, bailey bridge, Compact 200 Bailey Bridge, Compact 200 type Temporary Steel Bridge, Double Lane Bailey Steel Bridge, Single Lane Bailey Steel Bridge

Send Message