Product Introduction
Pouring concrete in the air takes something solid underneath it, and that's what the Bailey bridge formwork support frame gives you. It's a heavy-duty shoring tower built from Bailey panels that holds the wet concrete formwork while you cast a pier cap, a beam, or a deck. It carries the weight of the fresh concrete, the rebar, and the crews down to the ground or the pile foundation below.
We stack the panels into a grid of towers joined by horizontal beams, braced against wind and construction load. Because Bailey panels are made for heavy structural duty, they make a reuse-friendly shoring system - cheaper and easier than hauling in dedicated heavy falsework when the span or the site doesn't suit it.
Features
Runs on your existing Bailey panel stock - no special shoring gear to buy. The bailey bridge formwork support frame makes this practical.
The modular grid adapts to different heights and bay widths without fuss
Each tower leg takes a serious axial load, so heavy wet concrete is no problem
Galvanized panels laugh off concrete splatter and site corrosion
Faster up and down than traditional heavy shoring
Wide bay spacing means fewer towers under a broad deck
Pair it with jacks or screw bases for fine elevation control on the formwork
Working Principle
Fresh concrete is a heavy, fluid load, and it has to be fully supported until it's strong enough to stand on its own. The frame is that temporary support. We stack Bailey panels vertically into towers of the height we need, then arrange several towers in a grid under the deck or pier cap being poured. Across the top of each tower, horizontal Bailey beams or steel I-beam wales span between the tower heads. On those wales sit the formwork stringers and the soffit formwork. The bailey bridge formwork support frame is built for this.
The load drops straight down: concrete, rebar, formwork, and workers all press through the formwork into the wales, into the tower tops, down through the stacked panel legs, and into the foundation. The horizontal and diagonal bracing between towers turns the whole thing into one rigid space frame that shrugs off lateral loads - wind, a concrete pump surge, crew movement. When the concrete has cured to the strength we need, usually 70–80% of design, we strike the formwork and break the frame down for the next pour.
Applications
Cast-in-place concrete bridge pier cap construction. The bailey bridge formwork support frame makes this practical.
Concrete deck pour support on medium-span bridges
Falsework for cast-in-place concrete box girder segments
Building construction - shoring for elevated slabs or transfer girders
Dam or spillway concrete placement support
Industrial construction - support for heavy equipment foundations above grade